OPERATED SUCTION EXCAVATION
As a well known figure in the construction industry (both agriculture and civils, public and private sector) and with an expanding portfolio of machinery hire J.A Rattigan & Son Ltd offer safe effective suction excavation, thoughout London and the UK. By the means of high volume air flow, together with highly trained and certificated (CSCS (A78))suction specialists, surveyors, operators, drillers and engineers we are able to assist on a number of excavation projects.
SECTORS & FLEET
Sectors of works we currently work in are, but not inclusive are, utilities, civils, groundworks, telecoms, airports, power stations, refineries, railway works, basements, STW, WTW, trial holes, tree roots, bridge works. We currently run a mixed fleet of 17 units, with more on order, of 14t City Sucker, 26t & 32t units to allow us to offer suitable units for the job at hand.
PRODUCTIVITY GUIDE RATE
FLEET RANGE
“Rattigan was with us on site again, here at Hertfordshire Police Headquarters today and the entire team have, on numerous occasions, complemented Rattigans on their professional, positive and safe working approach to their work activities. Thank you for your help on site and we look forward to working with yourselves again.”
Hertfordshire Police
HOW IT WORKS…
Through the advanced design of these units, power is taken from the engine via a PTO ( POWER TAKE OFF ) and transferred to the fans which create a negative pressure / air flow to the rear of the arm high performance / durable 10″/ 250mm hose enabling the transfer of materials/liquids into its onboard storage/collection tank. As the air decelerates the materials drop from the air flow and remain in the chamber before the air continues through various cleaning stages before returning to atmosphere via the filter outlet.
The hydraulic arm is controlled via a hand held remote control unit allowing for a 180 degree working area movement from the rear of the truck and when required From the end nozzle ( metal or plastic depending on the job requirement ) , additional 10″/250mm transfer hoses can be added to allow for greater depth and distance works, materials pending.
LATEST PROJECTS
Network Rail, London
48 hr possession project, Locating & exposing services, Day & night 2 trucks a shift.
Ground Stabilisation Project
Removing loose ground prior to drilling.
Boat Refurbishment
Removal of ballast/stones from barge base.
Kent Education Department
Roof stone removal.
Central London
Water project, location of pipes.
London
Triple fan distance works.